banner

Lincoln Gap 3 BESS

Home Projects AustraliaLincoln Gap 3 BESS
wave

AUSTRALIA

Lincoln Gap 3 BESS

The Lincoln Gap 3 battery energy storage system is being co-developed with Lincoln Gap Wind Farm Stage 3 expansion and is adjacent to the existing Lincoln Gap Wind Farm stages 1 and 2. The LG 3 BESS project will complement the Stage 3 expansion with fast frequency response for 47% of the Stage 3 installed capacity. LG3 BESS is proposed to be connected to existing 275kV Corraberra Hill substation operated by ElectraNet.